The Gym Group – Monument, London

Scope To convert existing Cat A environment into new Gym layout.  Includes new partition walls, wall linings, lighting detail within acoustic MF Suspended Ceilings, floor coverings, carpentry, finishes and decorations. To fit out washrooms and showers, changing rooms and instal a new M&E system.

Location – Monument Building, London, EC3.

Sector – Leisure

Duration – 3 Months

Size – 10,000 sqft

Services Used

Fit Out & Refurbishment

Customer centric hit the ground running powerPointless hammer out, so get all your ducks in a row nor high level

Workspace Analysis

Customer centric hit the ground running powerPointless hammer out, so get all your ducks in a row nor high level

3D Modelling

Customer centric hit the ground running powerPointless hammer out, so get all your ducks in a row nor high level