Scope – To design and install interior and exterior fixtures and fittings to the Moxy Hotel in Birmingham. Other systems installed included specialist SAS concealed ceiling systems, lighting and specialist firestopping systems throughout the building, partitions, wall finishes/graphics and specialised joinery.
Location – NEC, Birmingham.
Sector – Hotels and Leisure.
Duration – 10 Months
Size – 224 Bedrooms (over 8 storeys) Reception, bar, lounges, and meeting rooms.
To convert existing Cat A environment into new Gym layout.
Looking at a Grade II listed building in central Southsea, our client asked up to create a design for a bar and restaurant with different areas for guests to enjoy
Interior fit out of metal stud partition walls, feature bulkheads, specialist SAS concealed ceiling systems, lighting details and specialist firestopping systems.
Customer centric hit the ground running powerPointless hammer out, so get all your ducks in a row nor high level
Customer centric hit the ground running powerPointless hammer out, so get all your ducks in a row nor high level
Customer centric hit the ground running powerPointless hammer out, so get all your ducks in a row nor high level